{"id":432909,"date":"2026-04-15T13:49:26","date_gmt":"2026-04-15T17:49:26","guid":{"rendered":"https:\/\/csdconstruction.qc.ca\/?p=432909"},"modified":"2026-04-21T14:52:09","modified_gmt":"2026-04-21T18:52:09","slug":"demenagement-de-notre-bureau-de-saint-jean-sur-richelieu","status":"publish","type":"post","link":"https:\/\/csdconstruction.qc.ca\/en\/2026\/04\/15\/demenagement-de-notre-bureau-de-saint-jean-sur-richelieu\/","title":{"rendered":"D\u00e9m\u00e9nagement de notre bureau de Saint-Jean-sur-Richelieu"},"content":{"rendered":"\n<p>Notre bureau de Saint-Jean-sur-Richelieu d\u00e9m\u00e9nage vers de nouveaux locaux, situ\u00e9s \u00e0 proximit\u00e9 de notre emplacement actuel.<\/p>\n\n\n\n<p><strong>Nouvelle adresse:&nbsp;<\/strong>895, boul. du S\u00e9minaire Nord&nbsp;(Complexe Tass\u00e9,&nbsp;\u00e0 200 m de nos anciens bureaux). Nos bureaux sont&nbsp;<strong>au&nbsp;4e \u00e9tage&nbsp;<\/strong>de l&#8217;immeuble.<\/p>\n\n\n\n<p>\u26a0\ufe0f&nbsp;<strong>Fermeture temporaire<\/strong><br>Le bureau sera ferm\u00e9 du&nbsp;<strong>mercredi 15 au lundi 20 avril 2026 inclusivement<\/strong>, le temps du d\u00e9m\u00e9nagement.&nbsp;Par contre, nous serons joignables par t\u00e9l\u00e9phone durant cette p\u00e9riode au: 450 348-9910&nbsp;et nos conseillers vont continuer de visiter les chantiers de la r\u00e9gion.<\/p>\n\n\n\n<p>\u27a1\ufe0f&nbsp;<strong>R\u00e9ouverture le 21 avril<\/strong><\/p>\n\n\n\n<p>Notre \u00e9quipe sera heureuse de vous accueillir dans ces nouveaux locaux et de continuer \u00e0 vous offrir les m\u00eames services SOLIDES!<\/p>\n\n\n\n<p>N\u2019h\u00e9sitez pas \u00e0 passer nous voir.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Notre bureau de Saint-Jean-sur-Richelieu d\u00e9m\u00e9nage vers de nouveaux locaux, situ\u00e9s \u00e0 proximit\u00e9 de notre emplacement actuel. Nouvelle adresse:&nbsp;895, boul. du S\u00e9minaire Nord&nbsp;(Complexe Tass\u00e9,&nbsp;\u00e0 200 m de nos anciens bureaux). Nos bureaux sont&nbsp;au&nbsp;4e \u00e9tage&nbsp;de l&#8217;immeuble. \u26a0\ufe0f&nbsp;Fermeture temporaireLe bureau sera ferm\u00e9 du&nbsp;mercredi 15 au lundi 20 avril 2026 inclusivement, le temps du d\u00e9m\u00e9nagement.&nbsp;Par contre, nous serons joignables [&hellip;]<\/p>\n","protected":false},"author":9364,"featured_media":432910,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[],"class_list":["post-432909","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/posts\/432909","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/users\/9364"}],"replies":[{"embeddable":true,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/comments?post=432909"}],"version-history":[{"count":1,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/posts\/432909\/revisions"}],"predecessor-version":[{"id":432912,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/posts\/432909\/revisions\/432912"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/media\/432910"}],"wp:attachment":[{"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/media?parent=432909"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/categories?post=432909"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/tags?post=432909"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}