{"id":432127,"date":"2025-06-03T14:41:05","date_gmt":"2025-06-03T18:41:05","guid":{"rendered":"https:\/\/csdconstruction.qc.ca\/?p=432127"},"modified":"2025-06-03T15:07:06","modified_gmt":"2025-06-03T19:07:06","slug":"greve-rassemblement-devant-les-bureaux-des-patrons","status":"publish","type":"post","link":"https:\/\/csdconstruction.qc.ca\/en\/2025\/06\/03\/greve-rassemblement-devant-les-bureaux-des-patrons\/","title":{"rendered":"GR\u00c8VE &#8211; rassemblement devant les bureaux des patrons"},"content":{"rendered":"\n<p>Les travailleurs et travailleuses du secteur r\u00e9sidentiel sont en&nbsp;gr\u00e8ve depuis le 28 mai&nbsp;et un&nbsp;<strong>grand rassemblement<\/strong>&nbsp;est pr\u00e9vu demain, mercredi le 4 juin:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Lieu<\/strong>: bureau&nbsp;de l&#8217;APCHQ de Montr\u00e9al<\/li>\n\n\n\n<li><strong>Heure<\/strong>: 11 h \u00e0 13 h &#8211; le discours du porte-parole de l&#8217;Alliance syndicale, Alexandre Ricard, aura lieu \u00e0 12 h 30<\/li>\n\n\n\n<li><strong>Sur place<\/strong>: musique, animation et repas du midi servi par des&nbsp;<em>food trucks<\/em>!<\/li>\n\n\n\n<li><strong>Transport en autobus inclus et privil\u00e9gi\u00e9<\/strong>, au d\u00e9part des points de rassemblement.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Quoi faire mercredi<\/h2>\n\n\n\n<p>Tous les travailleurs et travailleuses sont attendus&nbsp;\u00e0 leur&nbsp;<a href=\"https:\/\/www.facebook.com\/AllianceSyndicale\/posts\/pfbid0h4ah7Mhm4hFkV5zPejuzGdG1nVdLtztQmNtF1ijutvFHyEEtvHXofbGQdvZZbeTtl?rdid=YLJfx97Tf5x8DhYP#\" target=\"_blank\" rel=\"noreferrer noopener\">lieu de rassemblement habituel<\/a>, d\u00e8s 6 h:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>des autobus vous conduiront<\/strong>&nbsp;\u00e0 l&#8217;APCHQ (les heures varient selon le lieu, donc arrivez \u00e0 6 h pour ne rien manquer);<\/li>\n\n\n\n<li>des pancartes de l&#8217;Alliance seront fournies;<\/li>\n\n\n\n<li>pr\u00e9parez-vous \u00e0 FAIRE DU BRUIT!<\/li>\n<\/ul>\n\n\n\n<p>Vous n&#8217;\u00eates jamais venu\u00b7e&nbsp;aux points de rassemblement? Aucun probl\u00e8me, c&#8217;est LA journ\u00e9e pour le faire! Nous essayons de regrouper le plus de militants et militantes possible afin de passer un message clair \u00e0 l&#8217;APCHQ:&nbsp;<strong>\u00c0 travail \u00e9gal, paye \u00e9gale!<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>\u00c9v\u00e9nements pour les autres r\u00e9gions<\/strong><\/h2>\n\n\n\n<p>Les r\u00e9gions du Saguenay-Lac-Saint-Jean et du Bas-St-Laurent-Gasp\u00e9sie auront leurs propres manifestations devant les bureaux r\u00e9gionaux de l&#8217;APCHQ :<\/p>\n\n\n\n<p><strong>Chicoutimi et Alma<\/strong><br>1479, Boul. Saint-Paul, Chicoutimi, QC, G7J 3Y3<\/p>\n\n\n\n<p><strong>Rimouski, Rivi\u00e8re-du-Loup, Pasp\u00e9diac, Sainte-Anne-des-Monts, Gasp\u00e9 et Carleton<\/strong><br>243, Rue St-Germain Est, Rimouski, QC, G5L 1B6<\/p>\n\n\n\n<p>Rendez-vous \u00e9galement \u00e0 vos <a href=\"https:\/\/www.facebook.com\/share\/p\/16azx4DDva\/\" target=\"_blank\" rel=\"noreferrer noopener\">points de rassemblement<\/a> d\u00e8s 6 h&nbsp;puisque ces&nbsp;rassemblements devant l&#8217;APCHQ d\u00e9buteront \u00e0 11 h 30.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Fonds de gr\u00e8ve<\/strong><\/h2>\n\n\n\n<p>La CSD Construction a un fonds de gr\u00e8ve pour ses membres, que l\u2019on appelle l\u2019allocation de conflits. Pour en savoir plus, consultez <a href=\"https:\/\/csdconstruction.qc.ca\/2025\/05\/27\/greve-dans-le-secteur-residentiel-des-le-28-mai\/\">notre article sur l&#8217;allocation de conflits<\/a>.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-16018d1d wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-beige-color has-green-background-color has-text-color has-background has-link-color wp-element-button\" href=\"https:\/\/www.facebook.com\/share\/1LeHA8s6LN\/\" target=\"_blank\" rel=\"noreferrer noopener\">Voir la page de l&#8217;\u00c9v\u00e9nement sur Facebook<\/a><\/div>\n<\/div>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Les travailleurs et travailleuses du secteur r\u00e9sidentiel sont en&nbsp;gr\u00e8ve depuis le 28 mai&nbsp;et un&nbsp;grand rassemblement&nbsp;est pr\u00e9vu demain, mercredi le 4 juin: Quoi faire mercredi Tous les travailleurs et travailleuses sont attendus&nbsp;\u00e0 leur&nbsp;lieu de rassemblement habituel, d\u00e8s 6 h: Vous n&#8217;\u00eates jamais venu\u00b7e&nbsp;aux points de rassemblement? Aucun probl\u00e8me, c&#8217;est LA journ\u00e9e pour le faire! Nous essayons [&hellip;]<\/p>\n","protected":false},"author":9364,"featured_media":432128,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-432127","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nouvelles"],"acf":[],"_links":{"self":[{"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/posts\/432127","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/users\/9364"}],"replies":[{"embeddable":true,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/comments?post=432127"}],"version-history":[{"count":3,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/posts\/432127\/revisions"}],"predecessor-version":[{"id":432135,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/posts\/432127\/revisions\/432135"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/media\/432128"}],"wp:attachment":[{"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/media?parent=432127"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/categories?post=432127"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/tags?post=432127"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}