{"id":297195,"date":"2024-05-30T07:11:33","date_gmt":"2024-05-30T11:11:33","guid":{"rendered":"https:\/\/csdconstruction.qc.ca\/?p=297195"},"modified":"2024-08-01T10:11:14","modified_gmt":"2024-08-01T14:11:14","slug":"construction-resumes-on-fords-becancour-plant","status":"publish","type":"post","link":"https:\/\/csdconstruction.qc.ca\/en\/2024\/05\/30\/construction-resumes-on-fords-becancour-plant\/","title":{"rendered":"Construction Resumes on Ford&#8217;s B\u00e9cancour Plant"},"content":{"rendered":"\n<p>Workers at Ford\u2019s B\u00e9cancour cathode plant will be able to return to work after a month-long shutdown.<\/p>\n\n\n\n<p><em>After a month-long break, construction on Ford and partners\u2019 B\u00e9cancour cathode plant is resuming. According to our information, workers who are now back at work must fit out the floors, structures and walls of three buildings by November. \u2014\u00a0La Presse (free translation)<\/em><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.lapresse.ca\/affaires\/2024-05-29\/usine-de-cathodes-de-ford-a-becancour\/au-point-mort-depuis-un-mois-le-projet-redemarre.php\" target=\"_blank\" rel=\"noreferrer noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"963\" src=\"https:\/\/csdconstruction.qc.ca\/wp-content\/uploads\/2024\/05\/ford-redemarre-1024x963.png\" alt=\"\" class=\"wp-image-251502\" srcset=\"https:\/\/csdconstruction.qc.ca\/wp-content\/uploads\/2024\/05\/ford-redemarre-1024x963.png 1024w, https:\/\/csdconstruction.qc.ca\/wp-content\/uploads\/2024\/05\/ford-redemarre-300x282.png 300w, https:\/\/csdconstruction.qc.ca\/wp-content\/uploads\/2024\/05\/ford-redemarre-768x722.png 768w, https:\/\/csdconstruction.qc.ca\/wp-content\/uploads\/2024\/05\/ford-redemarre.png 1417w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-16018d1d wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-beige-color has-green-background-color has-text-color has-background wp-element-button\" href=\"https:\/\/www.lapresse.ca\/affaires\/2024-05-29\/usine-de-cathodes-de-ford-a-becancour\/au-point-mort-depuis-un-mois-le-projet-redemarre.php\" target=\"_blank\" rel=\"noreferrer noopener\">View full article<\/a><\/div>\n<\/div>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Workers at Ford\u2019s B\u00e9cancour cathode plant will be able to return to work after a month-long shutdown. After a month-long break, construction on Ford and partners\u2019 B\u00e9cancour cathode plant is resuming. According to our information, workers who are now back at work must fit out the floors, structures and walls of three buildings by November. [&hellip;]<\/p>\n","protected":false},"author":9364,"featured_media":297220,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-297195","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nouvelles"],"acf":[],"_links":{"self":[{"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/posts\/297195","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/users\/9364"}],"replies":[{"embeddable":true,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/comments?post=297195"}],"version-history":[{"count":2,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/posts\/297195\/revisions"}],"predecessor-version":[{"id":298217,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/posts\/297195\/revisions\/298217"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/media\/297220"}],"wp:attachment":[{"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/media?parent=297195"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/categories?post=297195"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/tags?post=297195"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}