{"id":198162,"date":"2026-03-19T12:59:32","date_gmt":"2026-03-19T16:59:32","guid":{"rendered":"https:\/\/csdconstruction.qc.ca\/?p=198162"},"modified":"2026-03-19T13:01:10","modified_gmt":"2026-03-19T17:01:10","slug":"statutory-holiday-good-friday-and-easter-monday","status":"publish","type":"post","link":"https:\/\/csdconstruction.qc.ca\/en\/2026\/03\/19\/statutory-holiday-good-friday-and-easter-monday\/","title":{"rendered":"Good Friday and Easter Monday Statutory Holidays"},"content":{"rendered":"\n<p>Dates of statutory holidays and vacations are detailed in our collective agreements. On Friday, April 3 and Monday, April 6, 2026, construction sites will be closed and any work carried out must be paid at the applicable wage rate, according to the specific sector\u2019s collective agreement.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-16018d1d wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-beige-color has-green-background-color has-text-color has-background wp-element-button\" href=\"https:\/\/csdconstruction.qc.ca\/en\/construction-industry\/construction-holidays-and-vacation\/\">View all stat holidays and vacations<\/a><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Dates of statutory holidays and vacations are detailed in our collective agreements. On Friday, April 3 and Monday, April 6, 2026, construction sites will be closed and any work carried out must be paid at the applicable wage rate, according to the specific sector\u2019s collective agreement.<\/p>\n","protected":false},"author":9364,"featured_media":432828,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-198162","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nouvelles"],"acf":[],"_links":{"self":[{"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/posts\/198162","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/users\/9364"}],"replies":[{"embeddable":true,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/comments?post=198162"}],"version-history":[{"count":3,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/posts\/198162\/revisions"}],"predecessor-version":[{"id":432830,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/posts\/198162\/revisions\/432830"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/media\/432828"}],"wp:attachment":[{"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/media?parent=198162"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/categories?post=198162"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/csdconstruction.qc.ca\/en\/wp-json\/wp\/v2\/tags?post=198162"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}